Before entering the tunnel, the intercepting ditch at the top of the tunnel and the drainage system at the entrance of the tunnel should be completed.<br>The collapsed soil at the top of the tunnel needs to be treated, and the geometric dimensions of the gutter and intercepting ditch should meet the drainage requirements, and the distance from the excavation slope line should not be less than 5m.<br>Conduct graded water collection in tunnels, pipeline drainage, and prepare sufficient drainage equipment to ensure normal construction and production during the rainy season.<br>(11) Small and medium-sized equipment on site must be equipped with rain covers or rain shelters according to regulations. Mechanical and electrical equipment must be installed with grounding safety devices, and the leakage protection device of the motorized switch box must be safe and reliable; Construction cables and wires should be buried underground as much as possible, and reliable fixing measures should be taken for exposed poles and wires; Insulation testing should be conducted on site equipment before the rainy season.
正在翻译中..