1, power on, check whether the operation of all parts is normal, normal after the power off.<br> 2, through the inverter will be separated belt, first adjusted to a certain number of turns, the normal work of the grain machine material flow to the pipe to reach 3/4, the pipe adjustment plate adjusted to a reasonable size, adjust the vibration feed, start work, vibration feed workload does not need to open too much.
正在翻译中..