Project introduction<br>The project aims to build a large-scale comprehensive industrial park with new energy vehicles as the core, including auto parts processing and manufacturing and surrounding industries. The plot covers 108000 square meters, including production workshop, warehouse, office, talent apartment, business hotel, exhibition center in product collection, commercial catering, etc. (Note: 1. 163 Mu * 666.667 M2 = 108000 m2. 2. There are 4 existing workshops, each of which is 2400 square meters, with a total area of 9600 square meters. In addition, only about 10000 square meters of ground beams are completed, with a total construction area of about 20000 square meters.)<br>The total investment of the project is US $63.49 million. Including 47.6 million US dollars of engineering cost, 15.89 million US dollars of other engineering construction costs (including: pre project consulting fee, engineering survey, design fee, engineering supervision fee, interest during construction period, etc.); (Note: calculated by the total investment of 400 million yuan, the current exchange rate is calculated by 1 US dollar to 6.3 RMB yuan, the engineering cost accounts for 75% of the total investment, and the others account for 25%)<br>Financing<br>According to the nature of the project investment, the construction capital of the project comes from the project capital and bank loans.<br>
正在翻译中..