1. sort out the color appliances that cannot reflect the new state during the year, form a list, and clearly reflect the date again; 2. To solve the problems of spray leakage and lack of paint on the edges of bumper, pedal, fender and other parts controlled by PDI at this stage, organize the Painting Department and Painting Quality Inspection Section to reach an agreement with PDI on the evaluation criteria at this stage; 3. Relocation and transformation of color parts subpackaging shall be carried out in combination with the transformation plan of subpackaging area of the general assembly plant, and the unified subpackaging point shall be moved to the side of the line for subpackaging, so as to reduce the scratches caused during subpackaging and distribution by reducing the subpackaging equivalent and distribution distance; 4. The door inner guard is upgraded in the subpackaging line, and the door inner guard needs to be manually transported and upgraded to be installed by a manipulator, so as to reduce scratches caused by drag and other factors during transportation;
正在翻译中..