2.5.1 ExpectationsAll equipments must be able to sustain an operating pressure of 160bar All movements must work at 40barEjection: Assembly guidance and hydraulic motion must ensure parallel movement of the ejection system with no deviation of more than 2mm per meter between all sides of the plate. Flow dividers can be installed if necessary.The cylinders must remain removable without acting on the spindle or the slide they are actuating