How to install soil layering settlement:<br>l, with the drill bit drilling, in order to make the tube smoothly put to the end, generally need to be deeper than the installation depth, its principle is 10 meters plus 0.5 meters, 20 meters, and l meters, and so on.<br>2, clear hole, drill drill to a predetermined position (preset value), do not immediately lift the drill, need to pump the piece of water down to fill the water, until the mud water into clear water, and then after the drill installation.<br>3, the installation of the pipe connection using an outer connector, one side down the pipe while injecting water into the pipe (when the pipe buoyancy is too large).<br>4, the installation of magnetic rings, according to the design requirements of each tube on the magnetic ring and positioning ring, and screw fixed positioning ring, and then insert the tube into the outer connector, tighten the screw, so that the edge down to the design depth.<br>5, if the interval distance of the magnetic ring is not positive 2 meters, can take the adjustment of the length of the tube to achieve, can also be used on the tube set positioning ring method solution, but to master a principle: the magnetic ring down to have enough settling distance, must meet its design requirements.<br>6, the subsidence tube into the depth required by the design, cover can be backfilled. Backfilling raw materials for the site dry fine soil or medium coarse sand, backfilling speed must not be too fast, so as not to clog back fillers do not go, thus forming a gap, preferably after a day or two to check, fillers sink and then fill can be, the tube around plus protective measures, can rest assured to be measured after.
正在翻译中..