1. What happen in Korea, exactly can be found similiar problems inside factory.韓國事件工廠內部有沒有類似的問題- Cleanness issue 清潔度2. AQL- 80 prs from 4 Art- 13 prs defects 16.25% defect rate, if follow AQL, we need to repack 驗80雙有13雙 不行- major issue: cleanness, minority: yellowing and bonding gap 清潔度、輕微發黃和小脫膠3. production- 6S- A: 2 models are good- B: 1 model (UB20) good, but still have slightly problems with cleanness. - SL20 is not good, lots kind of defects been missed. SL20不好,很多問題 - Similiar case with Korea和韓國問題一樣4. System- Digital real time data implementation數位化即時資料 - Warehouse: incorrect information in system: in system reveals reject, but inspection result is past...etc.成品倉:NG翻箱訂單電子螢幕和成品倉庫不一致 - Manual RQC report: 手寫報表5. Consistency:- Spraying machine: no instruction on SOP, same model of machine but different set up of temperature噴膠機沒有SOP,同一個型體不同溫度6. Final inspector:- Overall Quality is not so good from 2018~2019 - Call for action - LO/3rd party inspection will do comparison with final inspector - If matching rate is low than target, final inspector should be re-certificate again7. General feedback- Shoes in good shape- No major bonding issue been found before 12/20, LO will isue the audit result
1. What happen in Korea, exactly can be found similiar problems inside factory.韩国事件工厂内部有没有类似的问题<br><br>- Cleanness issue清洁度<br><br>2. AQL <br><br>- 80 prs from 4 Art <br><br>- 13 prs defects 16.25% defect rate, if follow AQL, we need to repack验80双有13双不行<br><br>- major issue: cleanness, minority: yellowing and bonding gap清洁度、轻微发黄和小脱胶<br><br>3. production <br><br>- 6S <br><br>- A: 2 models are good <br><br>- B: 1 model (UB20) good, but still have slightly problems with cleanness. <br><br>- SL20 is not good, lots kind of defects been missed. SL20不好,很多问题<br><br>- Similiar case with Korea和韩国问题一样<br><br>4. System <br><br>- Digital real time data implementation数位化即时资料<br><br>- Warehouse: incorrect information in system: in system reveals reject, but inspection result is past...etc.成品仓:NG翻箱订单电子萤幕和成品仓库不一致<br><br>- Manual RQC report:手写报表<br><br>5. Consistency: <br><br>- Spraying machine : no instruction on SOP, same model of machine but different set up of temperature喷胶机没有SOP,同一个型体不同温度<br><br>6. Final inspector: <br><br>- Overall Quality is not so good from 2018~2019 <br><br>- Call for action <br><br>- LO /3rd party inspection will do comparison with final inspector <br><br>- If matching rate is low than target, final inspector should be re-certificate again <br><br>7. General feedback <br><br>- Shoes in good shape <br><br>- No major bonding issue been found <br><br> <br><br>before 12/20, LO will isue the audit result
正在翻译中..