First of all, the drilling and completion data of adjacent wells are fully consulted and studied, and the best drilling and completion technical measures are selected. Then, the engineering selection of drill bit selection, drilling parameters and hydraulic parameters, drilling fluid density, drilling tool combination, etc. And optimization.
正在翻译中..