At the initial stage of the project, there is no electrical test module at the position of the communication station 7215B, and the electrical performance test is carried out after the temporary connection of the adapter cable, and the connector can not be error-proofed by using the wrong communication station. According to the investigation, on April 29th, 16 pieces of this product were electrified.
正在翻译中..