Each flow switch is equipped with 5 targets of different lengths. The normal installation requirement is that when using a long target, all targets shorter than this one need to be installed in order to increase the strength of the target, prevent deformation of the target after long-term operation, and reduce the detection effect. 2. The flow switch should be installed on a straight pipeline, and there should be at least 5 times the length of the pipeline on both sides. There should be no valves, tees, elbows, or other key components on the straight line. Based on the company's water distributor structure, it can be cut short to more than 1.5 times.
正在翻译中..