5. For large volume concrete works, there is no twice plastering, resulting in surface shrinkage cracks.<br>6. In the process of mass concrete pouring, the calculation of hydration is not accurate, the insulation work is not in place and the concrete on site is cooled down, which leads to the high internal temperature of concrete or the excessive internal and external temperature difference, resulting in the temperature crack of concrete.<br>7. The on-site maintenance measures are not in place, and the concrete is dehydrated early, causing shrinkage cracks.<br>