1.非标钢结构制作及安装范围:⑴所有砂斗、钢平台、立柱等;⑵扶梯、护栏、溜槽及接口;⑶除尘管路、支撑、检修平台;⑷设备维护平台、吊架支撑、带的英语翻译

1.非标钢结构制作及安装范围:⑴所有砂斗、钢平台、立柱等;⑵扶梯、护栏

1.非标钢结构制作及安装范围:⑴所有砂斗、钢平台、立柱等;⑵扶梯、护栏、溜槽及接口;⑶除尘管路、支撑、检修平台;⑷设备维护平台、吊架支撑、带式输送机支腿、地坑格子板、溜管等;⑸设备之间连接的桥架、穿线管、国标电线. 2.所有设备的地基及预埋件、预埋管由定作方负责。3.电器控制室房屋由定作方自行负责制作。4.本价格不包含减速机初始运作所需的润滑稀油。5.承揽方找车,货到定作方厂区,定作方付运费。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. The non-standard steel production and installation range: ⑴ all the sand hopper, steel platform, columns, etc.; ⑵ escalator, guardrail, and an interface chute; ⑶ dust line, a support, maintenance platform; ⑷ maintenance platform hanger support, Belt legs, pit grid plate, chute and the like; ⑸ bridge connection between devices, conduit, wire GB. <br>2. foundation and embedded parts of all the devices responsible for the ordering party embedded pipe. <br>3. The electrical control room houses by the ordering party are responsible for production. <br>4. The price does not include the initial gear lubricating thin oil required for operation. <br>5. contractor find a car, factory goods to the ordering party, the ordering party pay the freight.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. Non-standard steel structure production and installation range: (1) all sand buckets, steel platforms, columns, etc.; (2) escalators, guardrails, chutes and interfaces; (3) dust removal lines, support, maintenance platforms; (4) equipment maintenance platforms, hangers support, belt conveyor legs, pit grid, slings, etc.; (5) the bridge between the equipment, wire lines, wire lines, national lines. <br>2. The foundation and pre-buried parts of all equipment and pre-buried pipeshall shall be the responsibility of the fixed party.<br>3. Electrical control room housing by the fixed party responsible for the production.<br>4. This price does not include the lubricated oil required for the initial operation of the gearbox.<br>5. The contractor finds the car, the goods arrive at the fixed party factory area, the fixed party pays the freight.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Production and installation scope of non-standard steel structure: ⑴ all sand buckets, steel platforms, columns, etc.; ⑵ escalators, guardrails, chutes and interfaces; ⑶ dust removal pipeline, support, maintenance platform; ⑵ equipment maintenance platform, hanger support, leg of belt conveyor, pit grating, chute, etc.; ⑤ Bridge, threading pipe, national standard wire connecting between equipment<br>2. Foundation, embedded parts and embedded pipes of all equipment shall be in the charge of the ordering party.<br>3. The building of electrical control room shall be made by the ordering party.<br>4. This price does not include the lubricating oil required for the initial operation of the reducer.<br>5. The Contractor shall find the vehicle, deliver the goods to the ordering party's factory, and the ordering party shall pay the freight.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: