58m high gravity concrete dam in the Kunhar river, near the Paras village, and related appurtenant structures - River diversion works and sediment by-pass tunnel - Power circuit, including power intake, concrete lined headrace tunnel, upstream surge shaft, steel lined pressure haft and penstocks, downstream surge shaft, and concrete lined tailrace tunnel - Cavern type power for three (3) Francis turbines with 300 MW installed capacity, including access tunnels and exterior switch yard - Transmission and interconnection of 500 KV Line - Transmission and interconnection of 132 KV Line - Access roads of the hydropower scheme - Permanent colony for operational staff