Design requirements for warehouse foundation treatment: if the post construction settlement is ≤ 10m, the construction settlement must be ≥ 370.3mm; the bearing capacity of the surface soil after dynamic compaction or rolling is FAK ≥ 120kPa; the handover elevation of the foundation treatment shall be controlled according to the requirements of article 1.3.<br>The treatment method: "vacuum water load combined precompression + impact rolling combined technology", that is, vacuum precompression + covered water surcharge + impact rolling method is mainly used.<br>The foundation treatment scope of the site is expanded on each side and the surrounding roads are taken into account. The foundation treatment area is about 32560m2, divided into one treatment area, the treatment depth is about 20m below the surface, and the vertical drainage body is set to the bottom of layer ③ 2, which is sandy silt layer. The average covering depth is 2.0m. Before foundation treatment, 1.0m thick plain fill shall be backfilled on the surface of the site.<br>The calculation shows that the total preloading load of the undisturbed foundation soil is about 116kpa under the action of 80kPa vacuum load, 2m water cover load and 1.0m backfill load, which is far greater than the additional load of 85.65kpa under the service load, forming the overload preloading.<br>
正在翻译中..