1.04 Rates for measured work are deemed to include the costs of: fabrication and erection, any number, section type, size and length of components and fittings, expansion joints and trims (whether expressly required or installed at the discretion of the Contractor), holes required for other trades, including required stiffeners, temporary erection bracing and removal, anchor bolts and other fixing devices, casting into concrete, cutting concrete or providing temporary boxings or wedges to form holes or mortices and grouting on completion, packings and wedges, protective painting, fire proofing, grouting under anchorages. 1.05 Protective Painting and Fire Proofing on Structural Steel Work are deemed to include: work to all surfaces, work carried out on site or off site, work of any girth, preparation of surfaces, any method of application, rubbing down between coats
1.04 Rates for measured work are deemed to include the costs of: fabrication and erection, any number, section type, size and length of components and fittings, expansion joints and trims (whether expressly required or installed at the discretion of the Contractor), holes required for other trades, including required stiffeners, temporary erection bracing and removal, anchor bolts and other fixing devices, casting into concrete, cutting concrete or providing temporary boxings or wedges to form holes or mortices and grouting on completion, packings and wedges, protective painting, fire proofing, grouting under anchorages. 1.05 Protective Painting and Fire Proofing on Structural Steel Work are deemed to include: work to all surfaces, work carried out on site or off site, work of any girth, preparation of surfaces, any method of application, rubbing down between coats
正在翻译中..