1.04 Rates for measured work are deemed to include the costs of: fabri的简体中文翻译

1.04 Rates for measured work are de

1.04 Rates for measured work are deemed to include the costs of: fabrication and erection, any number, section type, size and length of components and fittings, expansion joints and trims (whether expressly required or installed at the discretion of the Contractor), holes required for other trades, including required stiffeners, temporary erection bracing and removal, anchor bolts and other fixing devices, casting into concrete, cutting concrete or providing temporary boxings or wedges to form holes or mortices and grouting on completion, packings and wedges, protective painting, fire proofing, grouting under anchorages. 1.05 Protective Painting and Fire Proofing on Structural Steel Work are deemed to include: work to all surfaces, work carried out on site or off site, work of any girth, preparation of surfaces, any method of application, rubbing down between coats
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
1.04被测工作的费率包括以下成本:制造和安装,任何数量,截面类型,部件和配件的大小和长度,伸缩缝和装饰件(无论是明确要求还是由承包商酌情决定安装),孔其他行业所需的工具,包括所需的加劲肋,临时的安装支撑和拆卸,地脚螺栓和其他固定装置,浇铸到混凝土中,切割混凝土或提供临时的拳击或楔形以形成孔或榫眼并在完成时进行灌浆,填料和楔形,防护漆,防火,在锚地下注浆。1.05对结构钢的防护喷漆和防火工作被认为包括:在所有表面上进行的工作,在现场或异地进行的工作,任何周长的工作,表面的准备,任何施工方法,
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
1.04 Rates for measured work are deemed to include the costs of: fabrication and erection, any number, section type, size and length of components and fittings, expansion joints and trims (whether expressly required or installed at the discretion of the Contractor), holes required for other trades, including required stiffeners, temporary erection bracing and removal, anchor bolts and other fixing devices, casting into concrete, cutting concrete or providing temporary boxings or wedges to form holes or mortices and grouting on completion, packings and wedges, protective painting, fire proofing, grouting under anchorages. 1.05 Protective Painting and Fire Proofing on Structural Steel Work are deemed to include: work to all surfaces, work carried out on site or off site, work of any girth, preparation of surfaces, any method of application, rubbing down between coats
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
1.04计量工程的费率应视为包括以下费用:制造和安装、任何数量、截面类型、部件和配件的尺寸和长度、伸缩缝和装饰件(无论是明确要求的还是由承包商自行决定安装的)、其他行业所需的孔,包括所需的加劲肋、临时安装支撑和拆除、锚栓和其他固定装置、浇筑到混凝土中、切割混凝土或提供临时箱盒或楔子以形成孔或榫眼和竣工灌浆、填料和楔子、保护漆、防火、锚下灌浆。1.05结构钢工程的防护漆和防火应包括:所有表面的工程、现场或场外进行的工程、任何周长的工程、表面处理、任何施工方法、涂层之间的磨擦<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: