5. 安装上转角、上水平段、中间出口和机头。中间出口安装时注意安装方向,安装完成后,须保证不同部件的链条导轨过度平滑,无错缝、突起等现象。每的英语翻译

5. 安装上转角、上水平段、中间出口和机头。中间出口安装时注意安装方向

5. 安装上转角、上水平段、中间出口和机头。中间出口安装时注意安装方向,安装完成后,须保证不同部件的链条导轨过度平滑,无错缝、突起等现象。每2米左右需要安装支架支撑。6. 安装链条,首先根据需求连接链条,链条的节数必须为6的倍数,连接链条时,所有的接头必须方向一致(卡簧在同一侧)。链条安装时应先将机座的链条张紧器调到最短处,将两侧链条接头卡簧相对,方便日后检修维护。安装完后张紧链条。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
5. Install the upper corner, upper horizontal section, middle outlet and machine head. Pay attention to the installation direction when installing the middle outlet. After the installation is completed, it is necessary to ensure that the chain guide rails of different components are excessively smooth, without wrong seams and protrusions. Every 2 meters or so need to install a bracket to support. <br>6. When installing the chain, first connect the chain according to the requirements. The number of chains must be a multiple of 6. When connecting the chain, all the connectors must be in the same direction (the snap springs are on the same side). When installing the chain, the chain tensioner of the base should be adjusted to the shortest position first, and the chain joints of the chain joints on both sides should be opposed to facilitate future maintenance. Tension the chain after installation.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
5. Install the upper corner, upper horizontal segment, intermediate exit and head. Middle exit installation pay attention to the installation direction, after installation, to ensure that the chain rails of different components are excessively smooth, no wrong seams, protrusions and other phenomena. Bracket support is required every 2 meters or so.<br>6. Install the chain, first according to the need to connect the chain, the number of chains must be a multiple of 6, when connecting the chain, all connectors must be in the same direction (the same side of the reed). Chain installation should first shift the chain tensioning device of the base to the shortest place, the two sides of the chain connector reed relative, convenient for future maintenance. Tighten the chain after installation.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
5. Install the upper corner, upper horizontal section, middle outlet and head. When installing the middle outlet, pay attention to the installation direction. After the installation, ensure that the chain guide rails of different parts are excessively smooth without staggered joints, protrusions and other phenomena. Support shall be installed every 2m or so.<br>6. When installing the chain, first connect the chain according to the demand. The number of chain sections must be a multiple of 6. When connecting the chain, all joints must have the same direction (the circlip is on the same side). When installing the chain, first adjust the chain tensioner of the base to the shortest place, and then put the chain joint circlips on both sides opposite, so as to facilitate future maintenance. Tension the chain after installation.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: