Dongjiang highway construction organization design, let me know more about the construction plan of the project. By collecting and sorting out all aspects of the information, I found that it is the most difficult to determine the main part of the construction plan, this part of the content is also the most important. According to the horizontal road diagram and network diagram can more clearly reflect the construction progress plan of the whole project, and lay the foundation for the preparation of materials, machinery and equipment, labor force, through the drawing of the general layout plan of construction, can plan the site ahead of time, and increase the utilization rate of the site. Reasonable compilation of construction organization design plays an extremely important role in project cost control, capital control and quality control. Due to the large construction area and tight construction period of the project, it is necessary to arrange the operation team and mechanical equipment to enter the field reasonably. In the process of compiling the construction organization design, the project quality and the safety of the operators are fully considered. The management mode adopts the linear function type, which can strengthen the management of the operators, so as to ensure the smooth construction of the project according to the schedule. Secondly, in order to avoid the interference caused by the construction operation to the residents, this project clarifies the basic requirements of civilized construction, and urges the operators to carry out the construction according to the regulations. The preparation of the construction organization design of the project, let me deeply know that from the foundation to the roof must have a complete set of construction plans, through which the quality, cost, schedule, safety can be effectively controlled, so as to obtain the maximum benefit at the minimum cost.