Due to the deviation between the structure and pipeline construction and installation, after the MK-3UB140EBR-2W425729-05-2 is installed, the tube shoe S110X-D24-0500-0150 is not centered on the structural beam (20mm to the north). Is it feasible to have trouble coordinating design confirmation? Thanks!