(1) A new 3800m long runway (the new North runway) and two parallel taxiways, AGL system;(2) Infrastructure works, including modification of roadworks on the existing Airport island and all associated street furniture, lighting, storm water drainage system, underground utilities and services etc;(3) Construction of auxiliary buildings and facilities, including electrical substation, communication equipment building, Aircraft Recovery Equipment Store and FSD North Boat Point;(4) Specified sections of the Western Vehicular Tunnel within the New Reclamation Area.