Per our project information, one is steel platform and the other is concrete building. Based on my last experience I prefer to the all the steel and concrete to the sub-contract for the reason below: Steel MTO not too much, only the steel platform and some steel frame in the concrete building. There will be a cup of interface between the concrete and steel, which will cost a lot of manpower, even schedule, coordination, steel supervise, quality and etc.