It is required to measure the height of the cooling teeth after the top bar is replaced in the die casting production site, and normal production can be carried out only after it meets the drawings or sealed samples. During the mass production of die casting, the height of the cooling teeth shall be checked every 4 hours, so that defective products can be found, corrected and isolated in time.