Excerpts In karst areas, the scale of economic development, rapid population growth, construction projects, roads, railways, airports, engineering, bridges, high-rise buildings and other water conservancy construction has been more and more attention. The latent soluble erosion surface in Wuhan is hidden under the alluvial layer of the river surface. There are few karst forms under the erosion surface. Its main survey methods are comprehensive geological survey, drilling, prospecting, hydrologic testing, indoor experiments and so on. It is suitable for the construction technology of piles in karst areas. The piling-based construction in the karst area, the connectivity of karst, the height of the water table, the nature of the filling in the cave gap, etc. played a decisive role.<br><br>The suitable construction methods of pile foundation in karst area include techniques such as artificial drilling hole filling pile, drilling into hole perfusion pile and impact-forming perforation pile, and the quality evaluation of the base pile must include the integrity of the base pile and the concrete strength of the pile. Keywords: karst; Construction technology: quality evaluation: pile foundation: pile-based construction
正在翻译中..