At the top of the emergency water tank to the GCT, in case flue gas temperature at the GCT outlet is too high, there are instruments that can't be reached. XZT suggest to add scaffolding, but no permanent platform. This is not acceptable as this equipment is a key safety equipment, it shall be routinely accessible for preventive maintenance.