Check the insulation and phase color, peel off the outer sheath, saw the steel armour, peel the inner insulation layer, weld the grounding wire of the shielding layer, treat the copper shielding layer, peel the semi conductive layer, clean the surface of the main insulation layer, install the semi conducting pipe (terminal head), install the branch sleeve, install the insulating sleeve and terminal block<br>
正在翻译中..