Overall Facility Period shall be a maximum of 21 years;There shall be an interest and principal holiday (the “Moratorium Period”) during the pre-construction and construction period (assumed to be circa 30 months), and for a further 36 months following the completion date of construction.See Annex I: Illustration of the RPS Facility Structure