Things to confirm <br>today 1. Will SMT arrange to produce 100 units today? <br>2.3 pcs assembly arrangement situation. <br>3. Plans for batch production of 500 units.
Confirmation is required today<br>1. Will SMT arrange to produce 100 units today?<br>2.3pcs assembly arrangements.<br>3.500 units in batches of production plans.
What needs to be confirmed today<br>1. Will SMT arrange to produce 100 sets today?<br>2.3pcs assembly arrangement.<br>3. Plan for batch production of 500 sets.<br>