(2)设备优化。聚醚醚酮精制设备主要由转筒、外壳及辅助设备电机、阀等构成,结构相对简单。取料阶段:将取料管线接到装填物料口,启动取料真空泵,的英语翻译

(2)设备优化。聚醚醚酮精制设备主要由转筒、外壳及辅助设备电机、阀等构

(2)设备优化。聚醚醚酮精制设备主要由转筒、外壳及辅助设备电机、阀等构成,结构相对简单。取料阶段:将取料管线接到装填物料口,启动取料真空泵,并依次打开进气阀,目的是将边角处物料由不同位置进气管口进入的空气吹扫到取料口处,便于物料取净。设备支架是设备稳固的基础;加热蒸汽出口便于蒸汽冷凝水排出;轴封是设备成功的关键小部件,涉及抽真空能否实现,能否漏液的关键;保温层使热量得到充分利用;空气过滤器净化进入系统中的空气;过滤器防止抽真空干燥时物料被带走。设备使用注意事项:①旋转筒转速不能过快,转速保持在5—7r/min;②丙酮浸取二苯砜时,压力不能过大,温度不能过高,设备密封要好,以防发生事故;③丙酮浸取结束通入水进行水洗时,先将水加到JZ101的1/3,切不可加满。浸泡30min后,将水放入水与丙酮混合液储罐,用精馏塔回收其中丙酮,避免丙酮流失。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
(2) Equipment optimization. The polyether ether ketone refining equipment is mainly composed of a rotating drum, a casing, auxiliary equipment motors, valves, etc., and the structure is relatively simple. Reclaiming stage: Connect the reclaiming pipeline to the filling material port, start the reclaiming vacuum pump, and open the air inlet valve in turn. The purpose is to purge the material at the corners from the air entering from the intake pipes at different positions to the reclaiming port. It is convenient to take out the materials. The equipment support is the solid foundation of the equipment; the heating steam outlet is convenient for the discharge of steam condensate; the shaft seal is the key small component for the success of the equipment, which relates to whether the vacuum can be realized and the key to the leakage; the insulation layer makes the heat fully utilized; the air The filter purifies the air entering the system; the filter prevents the material from being carried away during vacuum drying. Precautions for the use of the equipment: ①The rotating drum speed should not be too fast, and the speed should be kept at 5-7r/min; ②When acetone extracts diphenyl sulfone, the pressure should not be too high, the temperature should not be too high, and the equipment should be well sealed to prevent accidents; ③When the acetone leaching is completed, water is added for washing, first add water to 1/3 of JZ101, and never fill it up. After soaking for 30 minutes, put the water into the water and acetone mixed liquid storage tank, and use the distillation tower to recover the acetone to avoid the loss of acetone.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
(2) Equipment optimization. Polyether ketone refining equipment is mainly composed of rotary cylinder, housing and auxiliary equipment motors, valves, etc. , the structure is relatively simple. Picking stage: the feed pipeline is connected to the filling material port, the feed vacuum pump is activated, and the intake valve is opened in turn, in order to blow the air entering the corner material from the intake pipe in different positions to the intake port, so as to facilitate the material to be purified. The equipment support is the solid foundation of the equipment; Heating the steam outlet facilitates the discharge of steam condensate; Shaft seal is the key component of equipment success, involving whether vacuum extraction can be achieved, whether leakage can be the key; The insulation layer makes full use of the heat; Air filter purifying the air entering the system; The filter prevents the material from being removed when the vacuum is dry. Precautions for the use of equipment: (1) the rotation barrel speed can not be too fast, the speed is maintained at 5-7r/min; (2) Acetone immersion of diphenyl, the pressure can not be too large, the temperature can not be too high, the equipment seal is better, in order to prevent accidents; (3) Acetone leaching ends with water washing, first add water to JZ101 1/3, must not be filled. After soaking for 30min, put the water into the water and acetone mixture tank and recycle the acetone from the distillation tower to avoid acetone loss.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
(2) Equipment optimization. Peek refining equipment is mainly composed of rotary drum, shell, auxiliary equipment motor and valve, with relatively simple structure. Reclaiming stage: connect the reclaiming pipeline to the filling material port, start the reclaiming vacuum pump, and open the air inlet valve in turn, so as to purge the air from the inlet pipe ports at different positions at the corners to the reclaiming port, so as to clean the materials. The equipment support is the solid foundation of the equipment; the heating steam outlet is easy to discharge the steam condensate; the shaft seal is the key small part of the equipment, which is related to whether the vacuum can be realized and whether the liquid can leak; the insulation layer makes full use of the heat; the air filter purifies the air entering the system; the filter prevents the material from being taken away when the vacuum is dry. Precautions for the use of the equipment: ① the rotating speed of the rotating cylinder should not be too fast, and the rotating speed should be kept at 5-7r / min; ② when acetone is used to extract diphenylsulfone, the pressure should not be too high, the temperature should not be too high, and the equipment should be well sealed to prevent accidents; ③ when water is used for washing after acetone extraction, the water should be added to 1 / 3 of jz101, and must not be filled. After soaking for 30min, put the water into the storage tank of water acetone mixture, and recover the acetone in the storage tank with distillation column to avoid the loss of acetone.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: