THE HOARDING LAYOUT SHOWN IN THIS DRAWING IS INDICATIVE AND MINIMUM REQIREMENT ONLY. CONTRACTOR SHALL PROVIDE ALL NECESSARY HOARDINGS, NOT LIMITED TO THE EXTENT SHOWN HEBEIN. TO SUIT FOR THE PHASING ARRANGEMENT AHD ACTUAL SITE CONSITIONS. All HOARDING SHALL BE IN ACCORDANCE WITH THE ICE REQUIREMENT AND AS SPEECHIFIED IN THE SPECIFICATION PRELIMINARIES AND OTHER DERAWING.