To do list for supplier1.Copy mould have to be made by same supplier or factory2.Comparison 3D scan result for product 3D,old mould product 3D and new mould product 3D.3.X-ray inspection if it is requested by drawing( copy casting tooling)4. Material report( if change the sub supplier or material)5.5 pcs Full dimension inspection 6. CPK for key specification 7. DV&P plan( For function part)To do list for SFH1. Full dimension inspection 2.Try-out3.Bench test if need