C5.2.2 Compliance is determined by subjecting the parts to a fluid pressure of 1.5 times the maximum pressure (if testing with liquid) or 1.1 times the maximum pressure (if air pneumatic testing) of intended use during operation of the system. There shall be no leaks as a result.C5.3 Electrolyte blockage testsC5.3.1 Pump failure/blockage during chargingC5.3.1.1 A pump failure or potential electrolyte blockage from another cause during charging may lead to an overcharge condition in a flowing electrolyte battery system.C5.3.1.2 The Overcharge test of Section 13 shall additionally consider, for flowing electrolyte type battery systems, an overcharge condition that can result from an electrolyte pump failure or other cause leading to electrolyte line blockage.C5.3.2 Pump failure/blockage during dischargingC5.3.2.1 A pump failure or potential electrolyte blockage from another cause during discharge may lead to an overdischarge condition in an flowing electrolyte battery system.C5.3.2.2 The Overdischarge test of Section 15 shall be modified for flowing electrolyte type battery systems to consider an overdischarge condition resulting from an electrolyte pump failure or electrolyte blockage during a constant current discharge.