6.接通电源后,必须试运行一下设备,检查滚筒和水泵是否有异响,在无水试运行时间应小于30秒。7.管件连接好后,必须进行首次通水检漏和反冲洗系的英语翻译

6.接通电源后,必须试运行一下设备,检查滚筒和水泵是否有异响,在无水试

6.接通电源后,必须试运行一下设备,检查滚筒和水泵是否有异响,在无水试运行时间应小于30秒。7.管件连接好后,必须进行首次通水检漏和反冲洗系统试运行。通过观察窗查看清洗喷嘴喷水是否注入收集罐内。(特别注意: 在运行过程中,微滤机内必须有一定量的水才能启动反冲洗水泵,以免因缺水而损坏反冲洗水泵,特别是在首次安装试验时)8.每天不定期检查反冲洗系统喷嘴是否堵塞,影响反冲洗效果。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
6. After the power is turned on, the equipment must be tested to check whether there is abnormal noise in the drum and the water pump. The test run time should be less than 30 seconds without water. <br>7. After the pipe fittings are connected, the first water leak detection and test run of the backwash system must be carried out. Look through the viewing window to see if the cleaning nozzle spray water is injected into the collection tank. (Special attention: During operation, there must be a certain amount of water in the microfiltration machine to start the backwash pump, so as to avoid damage to the backwash pump due to lack of water, especially during the first installation test) <br>8. Check the backwash from time to time every day Whether the system nozzle is blocked will affect the backwashing effect.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
6. After the power is turned on, the equipment must be commissioned to check whether the drum and water pump have abnormal noise. The commissioning time without water shall be less than 30 seconds.<br>7. After the pipe fittings are connected, the first water leakage detection and backwashing system test run must be carried out. Check whether the water spray from the cleaning nozzle is injected into the collection tank through the observation window. (special attention: during operation, there must be a certain amount of water in the microfilter before starting the backwash pump to avoid damage to the backwash pump due to water shortage, especially during the first installation test)<br>8. Irregularly check whether the nozzle of the backwashing system is blocked every day, which affects the backwashing effect.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
6. After turning on the power supply, you must test run the equipment, and check whether the drum and water pump have abnormal sound. The test run time without water should be less than 30 seconds. 7. After the pipe fittings are connected, the first water leak detection and backwashing system commissioning must be carried out. Check whether the spray water from the cleaning nozzle is injected into the collecting tank through the observation window. (Special attention: during operation, there must be a certain amount of water in the microfilter to start the backwash pump, so as not to damage the backwash pump due to lack of water, especially during the first installation test) 8. Check whether the nozzle of backwashing system is blocked irregularly every day, which will affect the backwashing effect.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: