After the tower foundation reaches the specified strength, it should be verified whether the size of the embedded bolts meets the design and specification requirements, and the columns should be checked to ensure that they meet the quality requirements and transported to the vicinity of the foundation.<br> The sway rope shall be bound 400mm below the hanging rope and not more than 800mm from the top of the column.
正在翻译中..