Shen Yanli, director of the factory, put forward that: through the analysis of the problems such as poor matching, the most important problem is still some refinement problems; therefore, in the second half of the year, we should arrange the score reduction plan through two aspects: the first is the analysis, solution and treatment of typical problems; the second is the refinement improvement of assembly defects. Of course, we will try our best to improve the pipeline problems and appearance improvement.<br>
正在翻译中..