The treatment of construction joints shall be carried out after the preparation of the construction technical plan. The retention position of the post-pouring zone should be determined by design, and the concrete pouring of the post-pouring zone should be constructed according to the construction technical plan, and the building settlement should be ensured evenly. The concrete suspension mortar at the construction joints should be cleaned to the dense concrete surface.