Note:<br>1, the first performance test for destructive test, after the test is completed, the test piece will be transferred to the performance test scrap area for isolation.<br><br>2, reaction rules:<br> (1) The first inspection is not qualified, feedback to the technical technician to solve the problem, and the line body to carry out cross-sectional inspection, after the problem is resolved to restart the first inspection.<br> (2) When there is a problem or damage to the instrument used in the inspection, contact the workshop instrument manager to hand over to the laboratory for inspection and repair, and temporarily use laboratory equipment for the first inspection on site.
正在翻译中..