3.8.2 The next process enters the site for construction, the floor of 的简体中文翻译

3.8.2 The next process enters the s

3.8.2 The next process enters the site for construction, the floor of the piled construction area is covered and protected, the floor should be covered with anti-pollution plastic cloth under the paint and mortar operation surface, and the steel pipe seat of the operating frame should be equipped with pads and steel pipe handrails. Hard objects such as boards should be handled with care, and they should not be knocked against the floor of the building. 3.9 Quality protection of finished doors and windows 3.9.1 After the wooden door frame is installed, the gears should be set according to the regulations to prevent the door frame from being deformed. The two sides of the door frame at the entrance and exit of the transport lane should be equipped with groove-shaped protective baffles, which are the same height as the trolley, so as to prevent the trolley from damaging the door frame. 3.9.2 Do not use the pin heads of the door and window frames as the shelf rails. The window entry and exit materials should be provided with protective baffles, covered with plastic cloth to prevent crushing, bruising, pollution, etc. 3.9.3 During the construction of wall paint, doors and windows should be covered and protected by scaffolding erection and removal, and no collision or extrusion of doors and windows should be carried out . Do not knock, scribble, order or hang objects on doors and windows at will. When doors and windows are opened, the wind hooks and door bumps should be fastened according to regulations. 3.10 Protection measures for finished products before handover 3.10.1 In order to ensure the beautiful quality of the project and achieve user satisfaction, the project manager department should organize the full-time personnel to be responsible for the quality protection of the finished product according to the size of the project and the height of the floor. , On-duty inspections, protection of finished products. 3.10.2 Finished product protection personnel on duty shall carry out on-duty protection work in accordance with the protection zone or floor range designated by the project department. 3.10.3 Full-time finished product protection personnel, according to the finished product protection responsibilities, systems and methods specified in the construction organization design or project quality assurance plan, do a good job in the inspection of all finished products within the protection scope. The full-time finished product protection duty staff will work until the completion and acceptance, and terminate after the handover procedures are completed.3.10.4 Before the completion and transfer of the project, no one is allowed to use toilets, equipment and all other facilities in the project.结果 (英语) 2:[复制] 复制成功!2. Fire protection measures at the scene2.1 Do a good job in the project full fire education work, improve the fire awareness of the whole staff, check the fire equipment on the scene, so as to find problems and correct in a timely manner.2.2 For flammable, explosive material storage, storage should meet the requirements of fire safety, placement point equipped with fire-fighting facilities, for welding, acetylene and other construction when there are open fires and fire-prone places in addition to equipped with related fire facilities, the relevant construction personnel to do a good job of safety education to improve fire awareness is the key.2.3 Construction materials, the warehouse with non-combustible materials support. Inflammable and explosive items, should be stored in a special warehouse, classified separate storage, to maintain ventilation, fire in line with fire prevention regulations.2.4 Electrical equipment and wiring ensure good insulation, wires must not be tied to metal, all motors must be grounded zero according to regulations, and set up a single switch, in the event of a temporary power failure or stoppage rest, must pull the brakes and lock.2.5 All types of paints or other flammable and toxic materials shall be stored in a special warehouse and shall not be mixed with other materials. Volatile oils should be packed in an airtight container for safekeeping.2.6 Season construction: before and after the storm, to check the site temporary facilities, scaffolding, mechanical and electrical equipment, temporary lines, found tilt, deformation, sinking, leakage and leakage of electricity and other phenomena, timely repair and reinforcement, there is a serious danger, immediately excluded. Scaffolding, tower cranes, flammable and explosive warehouses, etc. set up temporary lightning protection devices, electrical switches for mechanical and electrical equipment, to have rain, moisture-proof facilities.2.7 On-site stacking fire prevention measures: material stacking should not be too much, between the stack should maintain a certain fire spacing, wood processing waste to be cleaned in time to prevent spontaneous combustion.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
3.8.2下一工序进入施工现场,对堆放的施工区域的地板进行覆盖和保护,在油漆和砂浆操作面下方的地板上铺上防污染的塑料布,并在地板的钢管座上覆盖该地板。操作框架应配备护垫和钢管扶手。硬物(例如木板)应小心处理,不要将其撞到建筑物的地板上。<BR>3.9成品门窗的质量保护<BR>3.9.1安装木门框后,应按规定安装齿轮,以防止门框变形。<BR>运输通道入口和出口处门框的两侧应装有与手推车高度相同的凹槽形防护挡板,以防止手推车损坏门框。<BR>3.9.2请勿将门窗框的销钉头用作搁板导轨。<BR>窗户的进出口材料应设有防护挡板,并用塑料布覆盖以防止压碎,擦伤,污染等<BR>。3.9.3在墙面涂料的施工过程中,门窗应加以覆盖并加以保护。<BR>脚手架的安装和拆卸,不得碰撞或挤压门窗。请勿随意敲门,乱涂,订购或将物品悬挂在门窗上。打开门窗时,应按规定紧固风钩和门碰。<BR>3.10<BR>交接前成品的保护措施3.10.1为了确保项目的美观质量和达到用户的满意程度,项目经理部门应组织专职人员对成品进行质量保护。项目的大小和地板的高度。,值班检查,保护成品。<BR>3.10.2值班的成品保护人员应按照项目部门指定的保护区域或楼层范围进行值班保护工作。<BR>3.10.3专职成品保护人员,根据施工组织设计或项目质量保证计划中规定的成品保护职责,系统和方法,做好保护范围内所有成品的检验工作。专职的成品保护工作人员将工作到完成并接受为止,并在移交程序完成后终止。<BR>3.10.4在项目完成和移交之前,不允许任何人使用厕所,设备和项目中的所有其他设施。<BR>结果(英语)2:[复制]<BR>复制成功!<BR>2.现场消防措施<BR>2.1做好项目全面消防教育工作,提高全体员工的消防意识,检查现场消防器材,以便发现问题并及时纠正。<BR>2.2对于易燃易爆物品的储存,储存应符合消防安全要求,放置点应配备消防设施,在有明火和易燃场所的基础上进行焊接,乙炔等施工,此外还应配备相关火源设施方面,有关施工人员要做好安全教育,提高消防意识是关键。<BR>2.3建材,仓库要有不燃材料的支撑。易燃易爆物品,应存放在专门的仓库内,分类存放,保持通风,防火,符合防火规定。<BR>2.4电气设备和接线确保良好的绝缘,电线不得与金属绑在一起,所有电动机必须按照规定接地零,并设置单个开关,如果暂时停电或停工休息,必须拉动制动器并锁定。<BR>2.5所有类型的油漆或其他易燃和有毒材料均应存储在专门的仓库中,并且不得与其他材料混合。挥发油应装在密封容器中以确保安全。<BR>2.6季节施工:暴风雨前后,要检查现场临时设施,脚手架,机电设备,临时线路,发现倾斜,变形,下沉,漏水和漏电等现象,及时维修加固,有严重危险,应立即排除。脚手架,塔式起重机,易燃易爆仓库等设置临时避雷装置,机电设备用电气开关,要有防雨,防潮的设施。<BR>2.7现场堆放的防火措施:物料堆放不应过多,堆放之间应保持一定的防火间距,木材加工废料要及时清理,以防止自燃。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
3.8.2 下一步进入施工现场,堆砌施工区域的地板被覆盖和保护,地板应覆盖油漆和砂浆操作面下的防污染塑料布,操作框架的钢管座椅应配备垫子和钢管扶手。硬物,如木板,应小心处理,不应被撞倒在建筑物的地板上。<BR>3.9 成品门窗的质量保护<BR>3.9.1 木门框安装完毕后,应按规定设置齿轮,防止门框变形。<BR>交通通道出入口的门框两侧应配备凹槽形防护挡板,其高度与手推车相同,以防止手推车损坏车门框。<BR>3.9.2 不要将门和窗框的针头用作架子栏杆。<BR>窗口出入口应配备防护挡板,用塑料布覆盖,防止碎裂、擦伤、污染等。<BR>3.9.3 在墙面油漆施工过程中,门窗应覆盖和保护<BR>脚手架的架设和拆除,不得对门窗进行碰撞或挤压。不要随地敲门、乱涂乱画、点菜或将物品挂在门窗上。门窗打开时,应按规定固定风钩和门撞。<BR>3.10 保护措施<BR>对于交接前的成品3.10.1为了保证工程的优美质量,实现用户满意,项目经理部门应根据项目规模和楼层高度,组织专职人员负责成品的质量保护工作。,值班检查,保护成品。<BR>3.10.2 成品保护人员值班人员应当按照项目部门指定的保护区或者落地范围开展值班保护工作。<BR>3.10.3 专职成品保护人员,按照施工组织设计或工程质量保证计划中规定的成品保护责任、制度和方法,做好保护范围内所有成品的检验工作。专职成品保护值班人员将工作至竣工验收,交接手续完成后终止。<BR>3.10.4 在项目完成和移交之前,不允许任何人使用该项目中的厕所、设备和所有其他设施。<BR>结果 (英语) 2:[复制]<BR>复制成功!<BR>2. 现场防火措施<BR>2.1 做好工程全面消防教育工作,提高全体职工的消防意识,现场检查消防设备,发现问题及时纠正。<BR>2.2 对于易燃易爆物品的存放、储存应符合消防安全要求,安置点配备消防设施,对于焊接、乙烯等施工时有明火和火灾易发场所的,除配备相关消防设施外,相关施工人员要做好安全教育,提高消防意识是关键。<BR>2.3 建筑材料,仓库用非可燃材料支撑。易燃易爆物品,应存放在专用仓库内,分类单独存放,保持通风,符合防火规定。<BR>2.4 电气设备和线路保证良好的绝缘性,电线不得与金属相连,所有电机必须按规定零接地,并设置单开关,在发生临时停电或停机休息时,必须拉动制动器和锁。<BR>2.5 各类涂料或者其他易燃、有毒物品应当存放在专用仓库中,不得与其他材料混合。挥发性油应装在密封容器中以保管。<BR>2.6季节施工:风暴前后,要检查现场临时设施、脚手架、机电设备、临时线路,发现倾斜、变形、下沉、漏电和漏电等现象,及时抢修加固,有严重隐患的,立即排除。脚手架、塔式起重机、易燃易爆仓库等设置了临时防雷装置、机电设备电气开关,有防雨、防潮设施。<BR>2.7 现场堆放防火措施:材料堆放不应过多,堆放之间应保持一定的防火间距,木材加工废弃物要及时清理,防止自燃。
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
3.8.2下道工序进场施工,对堆放施工区域的地面进行覆盖保护,在油漆、砂浆操作面下用防污塑料布覆盖地面,操作架的钢管座应设垫板和钢管扶手。应小心搬运硬物,如木板,不得将其撞到建筑物的地板上。<BR>3.9成品门窗质量保护<BR>3.9.1木门框安装后,应按规定设置档位,防止门框变形。<BR>运输车道出入口门框两侧应设置与小车高度相同的槽形防护挡板,防止小车损坏门框。<BR>3.9.2不得将门窗框的销头用作货架导轨。<BR>窗户进出口材料应设防护挡板,并用塑料布覆盖,防止压碎、碰伤、污染等。<BR>3.9.3墙面涂料施工时,门窗应加盖并用油漆保护<BR>搭拆脚手架,不得碰撞、挤压门窗。不得在门窗上随意敲击、涂鸦、点菜或悬挂物品。门窗开启时,应按规定紧固风钩和门碰。<BR>3.10防护措施<BR>3.10.1交工前成品,为保证工程的美观质量,达到用户满意,项目经理部应根据工程规模和楼层高度,组织专职人员负责成品的质量保护。值班检查,成品保护。<BR>3.10.2成品保护值班人员按项目部指定的保护区或保护范围进行值班保护工作。<BR>3.10.3专职成品保护人员按照施工组织设计或工程质量保证计划规定的成品保护职责、制度和方法,做好保护范围内所有成品的检验工作。专职成品保护值班人员工作至竣工验收,办理交接手续后终止。<BR>3.10.4工程竣工移交前,任何人不得使用工程内的厕所、设备和其他设施。<BR>结果 (英语) 2:[复制]<BR>复制成功!<BR>2现场消防措施<BR>2.1做好项目全员消防教育工作,提高全员消防意识,检查现场消防器材,发现问题及时纠正。<BR>2.2对于易燃、易爆物品的储存,储存时应符合消防安全要求,放置点应配备消防设施,对于焊接、乙炔等施工时有明火和火灾易发场所的,除配备相关消防设施外,做好相关施工人员的安全教育,提高防火意识是关键。<BR>2.3建筑材料,仓库用不燃材料支撑。易燃易爆物品,应存放在专用仓库内,分类分开存放,保持通风,符合防火规定。<BR>2.4电气设备及接线要保证绝缘良好,电线不得绑在金属上,所有电机必须按规定接零,并设置单开关,在发生临时停电或停机休息时,必须拉闸上锁。<BR>2.5各类油漆或其他易燃、有毒材料应存放在专用仓库内,不得与其他材料混放。挥发油应装在密封容器中保存。<BR>2.6季节性施工:暴雨前后,对现场临时设施、脚手架、机电设备、临时线路进行检查,发现倾斜、变形、下沉、漏电、漏电等现象,及时修复加固,有严重危险的,立即排除。脚手架、塔吊、易燃易爆仓库等设置临时防雷装置、机电设备电气开关,要有防雨、防潮设施。<BR>2.7现场堆放防火措施:材料堆放不宜过多,堆放间应保持一定的防火间距,木材加工废弃物要及时清理,防止自燃。<BR>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: