3.8.2 The next process enters the site for construction, the floor of the piled construction area is covered and protected, the floor should be covered with anti-pollution plastic cloth under the paint and mortar operation surface, and the steel pipe seat of the operating frame should be equipped with pads and steel pipe handrails. Hard objects such as boards should be handled with care, and they should not be knocked against the floor of the building. 3.9 Quality protection of finished doors and windows 3.9.1 After the wooden door frame is installed, the gears should be set according to the regulations to prevent the door frame from being deformed. The two sides of the door frame at the entrance and exit of the transport lane should be equipped with groove-shaped protective baffles, which are the same height as the trolley, so as to prevent the trolley from damaging the door frame. 3.9.2 Do not use the pin heads of the door and window frames as the shelf rails. The window entry and exit materials should be provided with protective baffles, covered with plastic cloth to prevent crushing, bruising, pollution, etc. 3.9.3 During the construction of wall paint, doors and windows should be covered and protected by scaffolding erection and removal, and no collision or extrusion of doors and windows should be carried out . Do not knock, scribble, order or hang objects on doors and windows at will. When doors and windows are opened, the wind hooks and door bumps should be fastened according to regulations. 3.10 Protection measures for finished products before handover 3.10.1 In order to ensure the beautiful quality of the project and achieve user satisfaction, the project manager department should organize the full-time personnel to be responsible for the quality protection of the finished product according to the size of the project and the height of the floor. , On-duty inspections, protection of finished products. 3.10.2 Finished product protection personnel on duty shall carry out on-duty protection work in accordance with the protection zone or floor range designated by the project department. 3.10.3 Full-time finished product protection personnel, according to the finished product protection responsibilities, systems and methods specified in the construction organization design or project quality assurance plan, do a good job in the inspection of all finished products within the protection scope. The full-time finished product protection duty staff will work until the completion and acceptance, and terminate after the handover procedures are completed.3.10.4 Before the completion and transfer of the project, no one is allowed to use toilets, equipment and all other facilities in the project.结果 (英语) 2:[复制] 复制成功!2. Fire protection measures at the scene2.1 Do a good job in the project full fire education work, improve the fire awareness of the whole staff, check the fire equipment on the scene, so as to find problems and correct in a timely manner.2.2 For flammable, explosive material storage, storage should meet the requirements of fire safety, placement point equipped with fire-fighting facilities, for welding, acetylene and other construction when there are open fires and fire-prone places in addition to equipped with related fire facilities, the relevant construction personnel to do a good job of safety education to improve fire awareness is the key.2.3 Construction materials, the warehouse with non-combustible materials support. Inflammable and explosive items, should be stored in a special warehouse, classified separate storage, to maintain ventilation, fire in line with fire prevention regulations.2.4 Electrical equipment and wiring ensure good insulation, wires must not be tied to metal, all motors must be grounded zero according to regulations, and set up a single switch, in the event of a temporary power failure or stoppage rest, must pull the brakes and lock.2.5 All types of paints or other flammable and toxic materials shall be stored in a special warehouse and shall not be mixed with other materials. Volatile oils should be packed in an airtight container for safekeeping.2.6 Season construction: before and after the storm, to check the site temporary facilities, scaffolding, mechanical and electrical equipment, temporary lines, found tilt, deformation, sinking, leakage and leakage of electricity and other phenomena, timely repair and reinforcement, there is a serious danger, immediately excluded. Scaffolding, tower cranes, flammable and explosive warehouses, etc. set up temporary lightning protection devices, electrical switches for mechanical and electrical equipment, to have rain, moisture-proof facilities.2.7 On-site stacking fire prevention measures: material stacking should not be too much, between the stack should maintain a certain fire spacing, wood processing waste to be cleaned in time to prevent spontaneous combustion.