This paper mainly expounds the problems of poor continuous operation and frequent failure of the cathode copper stripping unit due to the defects of system program design and unreasonable installation layout in the operation process; analyzes various factors affecting the operation time of the unit, reduces the operation failure of the unit, reduces the idle time of the unit and ensures the unit through system optimization and equipment re layout The operation efficiency is stable above 99%.<br>
正在翻译中..