Gradation and quality Approval is required In the quarry before transporting and dumping the material to the site.a) Granular selected & imported backfill around footing , foundation column, Hard core, Retaining wall, Under ramp & stair Compaction shall be made in layers of 200mm with roller and by sprinkling water to achieve the required proctor density which is (95% of the maximum dry Density).