1, GTL model's waterproof film R.D. changes, is expected to be issued on November 30, change order<br>2, temporary: 1, strengthen employee self-inspection, mutual inspection, 2, the problem into the off-line driver self-inspection, the total assembly left fault car for further analysis
正在翻译中..