1. The operator and the inspector have specified that the processing and measurement be conducted at the same temperature.Responsible: Yu Guanghui, Gao Zhiyang, 2022-03-262. The operator has made it clear to close the box according to the torque requirements of the drawing.Responsible: Yu Guanghui, 2022-03-26