The base layer, the base layer should be in a quality inspection units of 1km long section quality assessment pavement layer; with construction a large flow process, to complete the daily passage for the assessment unit. Construction should check the original records, to examine the contents of the preliminary assessment. Base layer, sub-base profile should include QA and quality after completion of both. Appearance inspection comply with the requirements of Appendix A. The quality of the technical indicators should be consistent with the provisions of Appendix B.
正在翻译中..