The root cause of this deviation is to ask inspectors because the product has not been produced (special products to prevent cross-contamination, only once a year) and forget, in the production of Ququzol (B process south line) did not fill in time H0-SOP-60006-R05 "special products to prevent cross-contamination monitoring list", resulting in the 2019 year did not have to comequer (B process south line) products in general environmental monitoring of pollutants. <br><br>View 212 workshop Y38 south line, a total of two products together: toquer (B process south line) and Anaquzole, two products general production area and clean area using the same set of air purification system. A total of seven environmental monitoring points are involved in the rhododendron (B process south line), the general area has not yet been monitored, Y38-02 clean area has been monitored, and the test results are not detected (i.e. ND). Review and analysis in 2018, to ququ (B process south line) has been produced and carried out a request for inspection, the test results meet the requirements. At the same time, air conditioning system and so on are in the verification period, view the exhaust gas treatment system maintenance records and ordinary area air conditioning system maintenance records, have been in accordance with the maintenance operating procedures for normal maintenance, no abnormal situation. The Anti-Oncology Division has designated relevant personnel to summarize the data on the implementation of the monitoring plan for the year at the end of each year, and this year only the data of querium (B-process south line) has not been monitored according to the monitoring plan, and no other products have been missed. The risk is low, the impact of this deviation is small, and the risk is manageable. See the D-TZ-API-01LE-19002-R-R-Ququzol (B-Process South Line) Environmental Contaminant Detection Bias Survey and Risk Assessment Report.<br><br>CP-TZ-API-D-TZ-API-01LE-19002-20001: Take this deviation as an example, organize 212 workshop related personnel to retrain H0-SOP-60006 Special Product Management Procedure01, emphasizing: Please check the document must be filled in, audited and approved on time.<br>CP-TZ-API-D-TZ-API-01LE-19002-20002: Plans to draft the Annual Monitoring Plan and Monthly Summary Feedback Form for The Special Product Symon Prevention division of the Anti-Oncology Division, and to release the product monitoring plan for the next month.
正在翻译中..