1, the total assembly control moment, to ensure that without breaking the seal ring to achieve the torque requirements.<br>2, into the factory quality control section to control the quality of suppliers.<br>3, this problem there is a risk of suspend production. It is recommended that the problem be upgraded to L2.
正在翻译中..