Refer to the checklist, all ME fixtures are ready and missed some jig for HE. Few questions for ME and HE as below: ME:1. All fixtures are completed modification? Eg. Add weight to increase friction to reduce movement during operation.2. Press fit machine: Does the wire holder improve?3. Plastic tweezer is in place?4. What is the temperature before packing (after cool down process)? Need to cool down temperature to prevent stream inside the plastic bag. HE:1. Modify all fixtures like ME?2. Is there any fixture for Fan and PTC assembly?3. Can pull in the schedule for HE – Button and Control board test jig?