If the construction has been completed and the owner, engineer or consultant changes the design, resulting in the need for modification or turnover, the main contractor shall be responsible for all relevant demolition, hole opening and hole plugging, but the mechanical and electrical contractor shall still be responsible for the provision and installation of sockets and the filling in sockets.