SECTION C: DOCUMENTATION REMARKS1.The technical proposal shall be signed and stamped by the manufacturer.2. The ITP signed and stamped by the manufacturer must be included in the -technical-proposals-A-sample-of-ITP-has-been-attached to this request The final ITP3. The technical proposals shall be submitted in hard copies and on cd.4. API SCT certificates of the manufacturer of raw materials must be included in the technical proposals.5. The running and installation manuals shall be included in the technical proposals.6. The catalogs of all tools mentioned in this request shall be included in the technical proposals. These catalogsshall include detailed specifications including OD ID, working pressure, working temperature, test pressure,material, features, advantages and disadvantages of each tool mentioned.7. The metallic and non-metallic materials selection table of the manufacturer shall be included in the technicalproposals.8. Completion strings schematic for all types of wells shall be included in the technical proposals