2. The corresponding auxiliary equipment must be included. <br>3. Equipped with cleaning balance cylinder. <br>4. The bidder is responsible for: installation of the energy pipeline of the filling machine: electricity (only one main cable is laid), products, CIP, air pressure, pure water, soft water, steam, hydrogen peroxide water exhaust pipeline installation, and a cleaning return pump. , 1 cleaning backflow butterfly valve, 1 disc filter, and ground drain pipe installation.