楼层放线定位简易流程图为:底层首级控制点确定→垂直投影底层首级控制点至楼层→弹出楼层首级控制网→结合楼层一级控制线复核点复核楼层首级控制网→的英语翻译

楼层放线定位简易流程图为:底层首级控制点确定→垂直投影底层首级控制点至

楼层放线定位简易流程图为:底层首级控制点确定→垂直投影底层首级控制点至楼层→弹出楼层首级控制网→结合楼层一级控制线复核点复核楼层首级控制网→弹出梁柱二级控制线→确定边环梁三级复核点位置→边环梁梁底模就位后利用三级复核点复核边环梁位置。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The simple flow chart for the positioning of the floor line is: confirm the first-level control point on the ground floor → vertically project the first-level control point on the ground floor to the floor → pop-up the first-level control network of the floor → review the first-level control network of the floor with the check point of the first-level control line of the floor → pop-up beam Column secondary control line→determine the position of the third-level review point of the side ring beam→after the bottom mold of the side ring beam is in place, use the third-level review point to review the position of the side ring beam.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The simple flowchart of floor line positioning is as follows: the first level control point of the ground floor is determined→ the first level control point of the vertical projection floor to the floor→ the first level control network of the pop-up floor→ and the first level of the floor control line review point review floor head The stage control net → pop-up beam column secondary control line→ determine the position of the side ring beam three-level review point→ the side ring beam bottom mold is in place and then use the three-stage review point to review the edge ring beam position.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The simple flow chart of floor setting out and positioning is as follows: Determination of the first level control point on the ground floor → vertical projection of the first level control point on the ground floor to the floor → pop up of the first level control network on the floor → review of the first level control network on the floor combined with the review point of the first level control line on the floor → pop up of the second level control line on the beam column → determination of the position of the third level review point on the side ring beam → use the third level review point to review the position of the side ring beam after the bottom mold of the side ring beam is in place .<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: