16.3.1 Functional test 1 shall be performed between the individual tests in the test sequence.16.3.2 Functional test 2 shall be performed before and after the test sequence. Before and after the sequence a 16.3.5 visual inspection of the DUT shall be performed.Requirement numbers need to be updated. Test sequence is preliminar.