Please arrange an engineer arrived at the scene at December 10, 2019 guiding the rotary furnace and crusher installation, working time is about 15 days. Attached is an invitation.
Please arrange for an engineer to arrive on site on 10 December 2019 to guide the installation of rotary furnaces and crushers, which will last approximately 15 days. The attachment is an invitation letter.
Please arrange an engineer to arrive at the site on December 10, 2019 to guide the installation of rotary furnace and crusher, with a working time of about 15 days. Attached is an invitation letter.<br>